Port of Everett has selected contractor 麻豆社区 to begin maintenance dredging of the Jetty Landing Boat Launch in January 2022.
The $1 million project will remove up to 41,000 cubic yards (cy) 鈥� equivalent to about 4,000 dump trucks loads 鈥� of river sediment that has settled in the launch basin and is impeding boaters at low tide. The work is expected to last through mid-February. See Port of Everett News below.